RIGHT-OF-WAY PERMITS

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

CHAPTER 12: PUBLIC WAYS AND PROPERTIES

The Engineering Services Department is responsible for reviewing applications and issuing the following permits. To ensure your application is properly tracked, please submit using our:

ONLINE PERMIT APPLICATION FORMS

ARTICLE 5: CONSTRUCTION OF FACILITIES IN THE RIGHT-OF-WAY

§ 12-5-4 PERMIT REQUIRED; APPLICATIONS AND FEES.

(A)   Permit required. No person shall construct (as defined in this article) any facility on, over, above, along, upon, under, across or within any village right-of-way which changes the location of the facility, adds a new facility, disrupts the right-of-way (as defined in this article), or materially increases the amount of area or space occupied by the facility on, over, above, along, under, across or within the right- of-way, without first filing an application with the Village Engineer and obtaining a permit from the village therefor, except as otherwise provided in this article. No permit shall be required for installation and maintenance of service connections to customers’ premises where there will be no disruption of the right-of-way.

ARTICLE 7: SMALL WIRELESS FACILITIES

§ 12-7-5 PERMITS; APPLICATION PROCESS.

Unless otherwise specifically exempted in this article, a permit to collocate a small wireless facility within the village is required in all cases.